RO Forecast
Industrial Reverse Osmosis Forecasting & Operations
Welcome to RO Forecast
No data is currently loaded. You can import historical RO logs from an Excel file, or start from scratch by creating a new site manually.
FSR Operational Focus & Immediate Attention Radar
Field Service SummaryClear, data-driven bullet points synthesized from hydraulic telemetry, water sample lab chemistry, and system health readings.
Standard Operational Baseline
Standard 65–75% recovery for 2-stage industrial RO. Upload a water assay in Water Chemistry to calculate site-specific saturation.
ℹ️ AI Operational Guidance: Baseline operational evaluation. Upload water chemistry report to calculate site-specific silica saturation and LSI scaling curves.
All Primary RO Parameters Within Safe Operating Envelope
💡 Why this matters: All measured pressures, normalized permeate flows, and saturation indices are currently tracking within baseline manufacturer limits.
Field technicians can execute the on-site physical actions above immediately. For complete thermodynamic saturation models, root-cause chemical physics, and official 6-step FSR reports, use the AI Consultant.
Industrial RO Core Focus: Hydraulic Pressures • Operational Telemetry • Water Sample Chemistry
Continuous cross-validation of 3-stage pressure transmitters (P1 → P2 → Final), normalized flow physics, and lab mineral saturation assays.
-- → -- → -- psi
Stage 1 ΔP: -- • Stage 2 ΔP: -- • Total: --
--% Rejection • -- GPM
Recovery: -- • ΔP Velocity: --
No Lab Assay Uploaded
Awaiting laboratory water analysis for active site
Recovery
Salt Rejection
Target: ≥ 98.5%
Salt Passage
Target: ≤ 1.5%
Feed Flow
Target: 240 - 300 GPM
Permeate Flow
Target: 180 - 220 GPM
Concentrate Flow
Target: 50 - 70 GPM
Differential Pressure
Target: < 25 psi
Health Score
Target: ≥ 75
Operational & Normalized Performance Trends
High-resolution waveform tracking with ASTM D4516 temperature & pressure normalization
Chemical & Tank Radar
Live inventory & calibrated delivery rates
3-Stage Pressure Profiling
P1 → P2 → Final gradient distribution
Today's FSR Field Action
Data-driven chronological protocol
Current System Topography & Process Flow
P&ID flow visualization, pretreatment filters, chemical dosing & RO array